- Home
- LSAT explanations
- PrepTest 146
- Section 2, Question 21
A local marsh would need to be drained(50 more words not shown)
The principle underlying the argument(14 more words not shown)
- AA new highway(45 more words not shown)
- BDefective products can(40 more words not shown)
- CA laboratory safety(53 more words not shown)
- DBuilding the new(49 more words not shown)
- EBuilding a light(36 more words not shown)
Reading the argument
Find out what the marsh does before draining it. That's the author's recommendation. We know similar marshes often help purify groundwater. We don't know whether this particular marsh plays that role in the city's well-water supply, because it hasn't been assessed. “Often” leaves room for this marsh to be different, so the argument hasn't established that the proposed construction will cause harm.
Still, a possibility of harm could be a reason to pause. I'd want to know how serious the risk is before deciding what restrictions are warranted, but the author has already made that decision: block the office complex while the relevant assessment is missing. This is a precaution, not a conclusion that the project must be rejected forever.
What we’re looking for
A matching argument should use the same reason to hold off. There should be a proposed action, a potentially harmful consequence, and insufficient checking of that risk. The conclusion should delay the action until the concern has been examined. Another environmental example could miss the point if it rejects a project for cost reasons or compares two known harms instead. What matters is the unchecked risk doing the work in the recommendation.
Working the answers
- A
The environmental assessment sounds familiar, but the reasoning is different. This assessment is required and would cost more than the highway's expected economic benefit. The author rejects the project on that cost-benefit basis. Our argument instead pauses a project because an important risk hasn't been assessed. It doesn't say the cost of investigating exceeds the project's benefit.
- BCorrect
The new appliances are the proposed office complex; possible defects and their costly consequences are the possible harm to the water supply. Thorough testing is missing, just as an assessment of the marsh is missing. The recommendation is to hold off on bringing the appliances to market now. Both arguments use an unchecked risk of harm as a reason to postpone action.
- C
The testing hasn't had the uninterrupted week it requires, so the report isn't ready. That explains why a report shouldn't be released yet. But our conclusion isn't simply that an investigation remains incomplete; it is that a separate action should be blocked while a potential harm is investigated. C never makes the corresponding recommendation to delay selling or using the grill.
- D
This compares two routes with known environmental consequences and recommends the one that avoids harming a wilderness area. The original doesn't choose between two routes based on established damage. It recommends waiting because the relevant effect hasn't been established. D has a preference between alternatives, rather than a pause for assessment.
- E
This acknowledges possible costs and delays but recommends proceeding because the alternative is intolerable congestion. That weighs a risk against a reason to act. It doesn't use the unchecked risk as a reason to pause, which is the principle we need.
More Strengthen questions
Learn the LSAT our way
Our platform drills Strengthen questions at your level and adjusts as you improve.