PrepTest 146, Section 2, Question 19

Must Be TrueDifficulty3 of 5
The questionFull text in your LawHub copy of PrepTest 146

Analyst: Any new natural-gas-powered electrical generation station needs(71 more words not shown)

The analyst's statements, if true,(13 more words not shown)

Reading the argument

Having transmission lines isn't enough. A new station also needs a nearby gas pipeline, a large body of water, and residents who won't oppose its construction. All four requirements matter.

The pipeline and water requirements narrow the current options to three bodies of water. Then the residents' opposition creates a problem at those locations. I notice that they oppose 'significant' construction: that wording matters, although building an electrical generation station is ordinarily a significant project. We shouldn't invent a tiny, insignificant station just to escape the stated problem.

What we’re looking for

My initial expectation is a restriction on building new stations at the currently available locations. For this most strongly supported question, let's test the choices against those requirements.

Working the answers

  • A

    This goes too far into the future. A problem with the current sites doesn't establish that all future electrical needs must be met through other sources. The pipeline network could change, for example, or residents' attitudes could eventually change. The present restrictions don't rule out every future route to using natural gas.

  • B

    Opposing construction doesn't mean moving away. The analyst gives us a requirement for locating a new station: residents must not oppose it. We aren't told how many people would relocate if a station were built, or even that anyone would.

  • C
    Correct

    Here's the possibility I hadn't fully worked through: extend the pipelines to other bodies of water. The current network reaches water only at the three locations where residents would oppose a major project. Expanding that network could bring a pipeline near a different lake whose residents don't object.

    C doesn't promise that expansion will produce a suitable site. The new location would still need water, transmission lines, and no resident opposition. It says expansion is required to get beyond the problem with the current locations. That is much narrower than A's claim that the country must turn to other energy sources altogether.

  • D

    We were given requirements for new stations, not a description of every existing station. A station might already stand near one of these bodies of water. D also changes 'three of our large bodies of water' into 'the three largest.' We weren't given that ranking either.

  • E

    The country has extensive transmission lines, but that doesn't tell us how residents feel about constructing additional ones. Opposition to a station doesn't establish either support for or opposition to new lines. E adds a comparison of residents' attitudes that the analyst never supplies.

More Must Be True questions

Learn the LSAT our way

Our platform drills Must Be True questions at your level and adjusts as you improve.

See plans and pricing

HFL LSAT Advisor

Online

Hi! I'm HFL's LSAT advisor.

Tell me your score and goal and I'll point you to the right plan — or ask me anything.